Two vertical flow wetlands. One is a circulation system treating the pond water. The other treats the wastewater from the outside toilets
The Orhei Constructed Wetland treatment plant, the biggest secondary treatment entirely based on CWs in the world
Castelluccio is one of the best hotspot of Central Italy, with its spellbound village and the great plateaus at 1400 m a.s.l. in the Sibillini mountain park. The new Constructed Wetland will treat the wastewater of Castelluccio village and tourism facilities, that progressively shift from less than 50 persons during winter up to 1000 or more persons during summer. The current treatment plant is inadequate to support this great variation. The new multistage CW system is constituted by a French scheme system of 1800 m2 followed by two parallel free water-pond system as polishing stage and recreational amenity (the pond will hold several rare aquatic plants typical of the Castelluccio plateau).
Intensified (aerated) wetland for wastewater treatment of 800 employees at the administrative center of a mining company, situated near Belo Horizonte, Brazil.
Conception: 2 Septic Tanks for pre-treatment, aerated wetland as main treatment and horizontal flow constructed wetland post treatment.
Wetland project and execution by Rotária do Brasil, Landscaping only execution by Rotária do Brasil.
One of the largest and most efficient wastewater treatment plant with french system reed bed filter in France.
Nominal capacity : 4000 p.e. with an extension to 6000 p.e.
Client: Sorø Municipality
Location: Tuelsø, Denmark
Established: 2003
Number of basins: 10
Sludge type: Activated sludge
Sludge volume: 550 tonnes DS/year
PE, amount: 22,000
Compact reed bed filter to treat raw unsettled domestic sewage (French system). Capacity : 315 people equivalent. Design and build : Epur Nature -2014.
Client: Vallø Municipality
Location:Strøby Ladeplads, Denmark
Established: 1998
Number of basins: 8
Sludge type: Activated sludge
Sludge volume per year: 300
PE, amount: 9000