Beautiful two stage French system treating the wastewater of a hamlet in the outskirts of Paris

Client: Greve Municipality

Location: Mosede, Denmark

Established: 1999

Number of basins: 10

Sludge type: Activated sludge

Sludge volume: 1,000 tonnes DS/year

PE, amount: 60,000

 

-          Adapted „French system“ for a nursing home,  Hogar de Ancianos Sta. Ana y San Joaquín y Asociación Ayuda Me Perú

-          All treated wastewater is reused for irrigation of agricultural used area

-          The 2 staged wetland system treats the domestic effluent of 55 residents and employees

-          The pre-treatment is carried out on the surface of an planted, vertical flowed gravel bed wetland with 2 charging points, used alternately (2 and 2 days) 

-          The post-treatment is carried out in an planted vertical flowed sand bed wetland with 4 divisions to maintain always the biologically activity in all parts of the wetland  

 

Design, Construction and Operation and mantainmance by Rotaria del Perú, online monitoring by SCADAweb

Client: Høje-Taastrup Municipality

Location:Kallerup, Denmark

Established: 1996

Number of basins: 2

Sludge type: Activated sludge

Sludge volume: 240 tonnes DS/year

PE, amount: 9,000

 

Pond treatment system to prevent algae growth at Bebat Tienen (Belgium)

"Zero Emission" would be the general goal for sustainability. Especially for industrial production. Tertiary treatment with constructed wetlands may be a proper solution for closing the loop. The new treatment wetland at Changshu Advanced Materials Industrial Park, Haiyu Town, Jiangsu Province, China, is not only reclaiming water. It is a stepping stone for humans searching nature and for endangered species within a widely industrialized zone. Designed as a beautiful park it provides recreational functions and serves as buffer stripe between chemical industries and urban areas.

The wetland visitor center with its terraces on the roof and near the water level reveals a stunning new perspective. Intersted visitors will be given looks inside of the wetland when entering the exhibition on the first floor. Accomplished with a water laboratory and wetland control room the Changshu AMIP wetland center is a perfect place for training and dissemination of environmental solutions.

 

Pouembout : a 250 p.e. reed bed filter was created to replace a deficient waste stabilization pond.

Client: Skive Municipality

Location: Skive, Denmark

Established: 1998 

Number of basins: 18

Sludge type: Activated sludge

Sludge volume: 1,375 tonnes DS/year

PE, amount: 123,000

 

Vertical flow FBA system treating deicing fluids of Buffalo airport, New York

Page 1 of 11