Client: Haslev Municipality
Location: Haslev, Denmark
Number of basins: 8
Sludge type: Active
Sludge volume per year: 500 tonnes DS/year
PE, amount: 8,000

Vertical flow wetland, 75 PE for an ecological housing project in Arnhem, the Netherlands.

Teeside: A 1000 m2, 3 stage passive vertical flow reed bed system, treating run off from an international airport fire fighting training facility.

Yaxley: A three stage system comprising lagoon with floating reed beds, surface flow horizontal and sub surface flow horizontal to treat 170 m3/d of vegetable wash water.

 

Wastewater treatment plant for 1200 p.e. at St-Affrique-les-Montagne, south west of France (Tarn), with 1 vertical flow reed bed combined with a surface flow polishing treatment

A 11000 m2 artificial pond and 2600 m2 reed bed filters were created for the storage and treatment of stormwater and runoff from Servier pharmaceutical Laboratories site in Gidy. Designed to be able to treat once-a-century rainfall. Capacity : 12000 m3. Design : Epur Nature. Established : 2014.

Balhall: A two stage, 185 m2,Aerated saturated vertical flow reed bed system treating 5 m3/d of settled, secondary sewage.

Saint Sulpice la Foret : a 1000 PE waste stabilization pond boosted to 1950 PE by addition of reed bed filters. A 2,400 m², vertical flow reed bed (French system), a 1,950 m² second stage vertical flow, unsaturated plus a 10,000 m² of willow plantation and a 5,000 m² pond treating 400 m3/d of domestic effluent.

A horizontal subsurface flow constructed wetland treating the wastewater from a housing scheme in the tropical island of Mayotte 

Page 1 of 10