Intensified (aerated) wetland for wastewater treatment of 800 employees at the administrative center of a mining company, situated near Belo Horizonte, Brazil.

Conception: 2 Septic Tanks for pre-treatment, aerated wetland as main treatment and horizontal flow constructed wetland post treatment.  

Wetland project and execution by Rotária do Brasil, Landscaping only execution by Rotária do Brasil.

 

Saint Germain sur Ille : a 500 PE waste stabilization pond boosted to 900 PE by addition of reed bed filters with high standards for phosphorus and total nitrogen removal.

Castelluccio is one of the best hotspot of Central Italy, with its spellbound village and the great plateaus at 1400 m a.s.l. in the Sibillini mountain park. The new Constructed Wetland will treat the wastewater of Castelluccio village and tourism facilities, that progressively shift from less than 50 persons during winter up to 1000 or more persons during summer. The current treatment plant is inadequate to support this great variation. The new multistage CW system is constituted by a French scheme system of 1800 m2 followed by two parallel free water-pond system as polishing stage and recreational amenity (the pond will hold several rare aquatic plants typical of the Castelluccio plateau).

Teeside: A 1000 m2, 3 stage passive vertical flow reed bed system, treating run off from an international airport fire fighting training facility.

Wetland to treat run-off from deicing operations contaminated with high concentrations of glycol compounds and capable of handling peak flows and loading from winter storms.

Llanfair PG: A 440 m2, vertical flow reed bed treating 55m3/d of domestic effluent from a residential education centre.

 

Beautiful two stage French system treating the wastewater of a hamlet in the outskirts of Paris

Orelle (French Alps): a 1200 m², vertical flow reed bed (French system) plus a 800 m² second stage unsaturated vertical flow reed bed for domestic effluent under cold climate conditions.

 

Aerated wetland for a hotel in Antwerp, Belgium

Client: Greve Municipality

Location: Mosede, Denmark

Established: 1999

Number of basins: 10

Sludge type: Activated sludge

Sludge volume: 1,000 tonnes DS/year

PE, amount: 60,000