Saint Sulpice la Foret : a 1000 PE waste stabilization pond boosted to 1950 PE by addition of reed bed filters. A 2,400 m², vertical flow reed bed (French system), a 1,950 m² second stage vertical flow, unsaturated plus a 10,000 m² of willow plantation and a 5,000 m² pond treating 400 m3/d of domestic effluent.
- Adapted „French system“ for a nursing home, Hogar de Ancianos Sta. Ana y San Joaquín y Asociación Ayuda Me Perú
- All treated wastewater is reused for irrigation of agricultural used area
- The 2 staged wetland system treats the domestic effluent of 55 residents and employees
- The pre-treatment is carried out on the surface of an planted, vertical flowed gravel bed wetland with 2 charging points, used alternately (2 and 2 days)
- The post-treatment is carried out in an planted vertical flowed sand bed wetland with 4 divisions to maintain always the biologically activity in all parts of the wetland
Design, Construction and Operation and mantainmance by Rotaria del Perú, online monitoring by SCADAweb
Dufftown: An 800m2 surface flow reed bed, treating 650 m3/d of copper contaminated effluent from three distilleries.
Aldbrough: A 210 m2, vertical flow bed, treating 14 m3/d of methanol loaded industrial effluent from a gas storage plant.
A horizontal subsurface flow constructed wetland treating the wastewater from a housing scheme in the tropical island of Mayotte
Bezannes : a 8000 m² artificial pond plus 3500 m² of reed bed filters and 1600 m² of wetlands were created to treat stormwater runoff from a large non-residential area.
Resolis: Two 200m2 horizontal subsurface flow wetlands operated in paralell treating 10m3/d of secondary sewage.