The municipal centralised treatment plant (a classic activated sludge technology) for the wastewater produced by the municipality of Jesi (Ancona province – central Italy) has been upgraded in the year 2002, with the realisation of a new “nitrification-denitrification” compartment and a hybrid Constructed Wetland as polishing stage.
The Orhei Constructed Wetland treatment plant, the biggest secondary treatment entirely based on CWs in the world
Earls Colne: Two 800m2 vertical flow reed beds operated alternately to treat 1,168m3/d of tertiary sewage waste water.
2-stage vertical flow reed bed filter for the treatment of raw unsettled domestic sewage (French system). Capacity : 1200 People Equivalent.
More...
Intensified (aerated) wetland for wastewater treatment of 800 employees at the administrative center of a mining company, situated near Belo Horizonte, Brazil.
Conception: 2 Septic Tanks for pre-treatment, aerated wetland as main treatment and horizontal flow constructed wetland post treatment.
Wetland project and execution by Rotária do Brasil, Landscaping only execution by Rotária do Brasil.
The Badboot in Antwerp. Treatment of sanitary wastewater combined with wastewater from the swimming pool filters. FBA-type (aerated).
2-stage vertical flow reed bed filter treating raw domestic sewage (French system) with a capacity of 650 P.E. Treated effluent goes through a filtering ditch and is rejected into the river Bourdic.