Llanfair PG: A 440 m2, vertical flow reed bed treating 55m3/d of domestic effluent from a residential education centre.

Aerated wetland for a hotel in Antwerp, Belgium

Crynant: Two 1,200m2 vertical flow reed beds operated alternately to treat 3,400 m3/d of tertiary municipal waste water.

Vertical flow wetland, 75 PE for an ecological housing project in Arnhem, the Netherlands.

Corsendonk Featured

Aerated wetland at hotel/conference center.

Intensified (aerated) wetland for wastewater treatment of 800 employees at the administrative center of a mining company, situated near Belo Horizonte, Brazil.

Conception: 2 Septic Tanks for pre-treatment, aerated wetland as main treatment and horizontal flow constructed wetland post treatment.  

Wetland project and execution by Rotária do Brasil, Landscaping only execution by Rotária do Brasil.

 

20 years old French system serving 200 p.e. in the Lyon area

Castelluccio is one of the best hotspot of Central Italy, with its spellbound village and the great plateaus at 1400 m a.s.l. in the Sibillini mountain park. The new Constructed Wetland will treat the wastewater of Castelluccio village and tourism facilities, that progressively shift from less than 50 persons during winter up to 1000 or more persons during summer. The current treatment plant is inadequate to support this great variation. The new multistage CW system is constituted by a French scheme system of 1800 m2 followed by two parallel free water-pond system as polishing stage and recreational amenity (the pond will hold several rare aquatic plants typical of the Castelluccio plateau).

A horizontal subsurface flow constructed wetland treating the wastewater from a housing scheme in the tropical island of Mayotte 

Page 2 of 4