Vertical flow constructed wetland treating the sanitary wastewater from the border control office at Kallo (Antwerp, Belgium)
A horizontal subsurface flow constructed wetland treating the wastewater from a housing scheme in the tropical island of Mayotte
Albondon (600 PE) : the first "French system" in Spain, designed and build in 2005 by AKUT and SINT treats the waste water of a town in the foothills of the Sierra Nevada
One stage of reed beds fed with raw sewage assures primary and secondary treatment for 1200 People Equivalent, followed by a trickling filter for polishing and nitrification. A tertiary UV treatment enables a pathogens removal by 4 U log.
A 10 years old CW multistage system (5 stages: Imhoff+HF+VF+HF+FWS) treating the municipal wastewater for a town of 3500 inhabitants.
Allenwiller : a 1700 m², vertical flow reed bed (French system) plus a 960 m² second stage unsaturated vertical flow reed bed filter, treating 495 m3/d of domestic effluent from three villages (1100 PE) in Alsace.
At Escurolles, in central France (Allier), a reed bed fed with raw sewage assures primary and secondary treatment for 705 PE , followed by a tricking filter for polishing and nitrification
More...
Wastewater treatment plant for 1250 p.e., in a very touristic site in the south of France, separative sewerage system, constructed in 1998.
“French sytem” treating raw unsettled sewage in a 2 stage vertical flow reed bed filter without electricity
Orelle (French Alps): a 1200 m², vertical flow reed bed (French system) plus a 800 m² second stage unsaturated vertical flow reed bed for domestic effluent under cold climate conditions.
Castelluccio is one of the best hotspot of Central Italy, with its spellbound village and the great plateaus at 1400 m a.s.l. in the Sibillini mountain park. The new Constructed Wetland will treat the wastewater of Castelluccio village and tourism facilities, that progressively shift from less than 50 persons during winter up to 1000 or more persons during summer. The current treatment plant is inadequate to support this great variation. The new multistage CW system is constituted by a French scheme system of 1800 m2 followed by two parallel free water-pond system as polishing stage and recreational amenity (the pond will hold several rare aquatic plants typical of the Castelluccio plateau).











