Large treatment wetland in the northwest of France, near the city of Le Mans, treating 4000 PE and also large amounts of storm and drainage water. Zero surface water discharge in summer.
Earls Colne: Two 800m2 vertical flow reed beds operated alternately to treat 1,168m3/d of tertiary sewage waste water.
Saint Sulpice la Foret : a 1000 PE waste stabilization pond boosted to 1950 PE by addition of reed bed filters. A 2,400 m², vertical flow reed bed (French system), a 1,950 m² second stage vertical flow, unsaturated plus a 10,000 m² of willow plantation and a 5,000 m² pond treating 400 m3/d of domestic effluent.
2-stage vertical flow reed bed filter for the treatment of raw unsettled domestic sewage (French system). Capacity : 1200 People Equivalent.
Segonzac wastewater treatment plant for domestic sewage - Capacity 1600 people equivalent. In the shape of snail, emblem of the village. Design : Epur Nature. 2014
Albondon (600 PE) : the first "French system" in Spain, designed and build in 2005 by AKUT and SINT treats the waste water of a town in the foothills of the Sierra Nevada
Bauduen : a 2-stage Vertical FLow reed bed filter (French Design) for the treatment of domestic effluent from a village with variable population. A UV tertiary treatment ensures pathogens removal for protection of the bathing area in the lake downstream.
More...
Wastewater treatment plant for 1250 p.e., in a very touristic site in the south of France, separative sewerage system, constructed in 1998.
“French sytem” treating raw unsettled sewage in a 2 stage vertical flow reed bed filter without electricity
Castelluccio is one of the best hotspot of Central Italy, with its spellbound village and the great plateaus at 1400 m a.s.l. in the Sibillini mountain park. The new Constructed Wetland will treat the wastewater of Castelluccio village and tourism facilities, that progressively shift from less than 50 persons during winter up to 1000 or more persons during summer. The current treatment plant is inadequate to support this great variation. The new multistage CW system is constituted by a French scheme system of 1800 m2 followed by two parallel free water-pond system as polishing stage and recreational amenity (the pond will hold several rare aquatic plants typical of the Castelluccio plateau).