The two stage reed bed system at Aumont (500 PE), in the French Jura mountains meets stringent discharge standards in phosphorous removal through a third stage filtration with reactive media

A vertical flow reed bed (French system) and a vegetated polishing zone (surface flow wetland)  treating 117m3/d of domestic effluent from a village with variable population

The municipal centralised treatment plant (a classic activated sludge technology) for the wastewater produced by the municipality of Jesi (Ancona province – central Italy) has been upgraded in the year 2002, with the realisation of a new “nitrification-denitrification” compartment and a hybrid Constructed Wetland as polishing stage. 

Intensified (aerated) wetland for wastewater treatment of 800 employees at the administrative center of a mining company, situated near Belo Horizonte, Brazil.

Conception: 2 Septic Tanks for pre-treatment, aerated wetland as main treatment and horizontal flow constructed wetland post treatment.  

Wetland project and execution by Rotária do Brasil, Landscaping only execution by Rotária do Brasil.

 

Client: Høje-Taastrup Municipality

Location:Kallerup, Denmark

Established: 1996

Number of basins: 2

Sludge type: Activated sludge

Sludge volume: 240 tonnes DS/year

PE, amount: 9,000

 

Earls Colne: Two 800m2 vertical flow reed beds operated alternately to treat 1,168m3/d of tertiary sewage waste water.

Client: Rudkøbing Municipality

Location: Rudkøbing, Denmark

Established: 1992

Number of basins: 8

Sludge type:Activated sludge

Sludge volume: 232 tonnes DS/year

PE, amount: 13,000

One stage of reed beds fed with raw sewage assures primary and secondary treatment for 1200 People Equivalent, followed by a trickling filter for polishing and nitrification. A tertiary UV treatment enables a pathogens removal by 4 U log.