Saint Germain sur Ille : a 500 PE waste stabilization pond boosted to 900 PE by addition of reed bed filters with high standards for phosphorus and total nitrogen removal.

Saint Sulpice la Foret : a 1000 PE waste stabilization pond boosted to 1950 PE by addition of reed bed filters. A 2,400 m², vertical flow reed bed (French system), a 1,950 m² second stage vertical flow, unsaturated plus a 10,000 m² of willow plantation and a 5,000 m² pond treating 400 m3/d of domestic effluent.

Client: Greve Municipality

Location: Mosede, Denmark

Established: 1999

Number of basins: 10

Sludge type: Activated sludge

Sludge volume: 1,000 tonnes DS/year

PE, amount: 60,000

 

Allenwiller : a 1700 m², vertical flow reed bed (French system) plus a 960 m² second stage unsaturated vertical flow reed bed filter, treating 495 m3/d of domestic effluent from three villages (1100 PE) in Alsace.

Dufftown: An 800m2 surface flow reed bed, treating 650 m3/d of copper contaminated effluent from three distilleries.

Wetland to treat run-off from deicing operations contaminated with high concentrations of glycol compounds and capable of handling peak flows and loading from winter storms.

Client: Galten Municipality

Location: Skovby, Denmark

Established: 1995

Number of basins: 8

Sludge type:Activated sludge

Sludge volume: 185 tonnes DS/year

PE, amount: 12,000