Client: Sorø Municipality
Location: Tuelsø, Denmark
Established: 2003
Number of basins: 10
Sludge type: Activated sludge
Sludge volume: 550 tonnes DS/year
PE, amount: 22,000
Client: Kolding Municipality
Location:Kolding, Denmark
Established: 1998
Number of basins: 13
Sludge type:Activated sludge and digested sludge
Sludge volume: 2,000 tonnes DS/year
PE, amount: 125,000
Sludge type: Active
Sludge volume per year: 500 tonnes DS/year
PE, amount: 8,000
Intensified (aerated) wetland for wastewater treatment of 800 employees at the administrative center of a mining company, situated near Belo Horizonte, Brazil.
Conception: 2 Septic Tanks for pre-treatment, aerated wetland as main treatment and horizontal flow constructed wetland post treatment.
Wetland project and execution by Rotária do Brasil, Landscaping only execution by Rotária do Brasil.
Allenwiller : a 1700 m², vertical flow reed bed (French system) plus a 960 m² second stage unsaturated vertical flow reed bed filter, treating 495 m3/d of domestic effluent from three villages (1100 PE) in Alsace.
Castelluccio is one of the best hotspot of Central Italy, with its spellbound village and the great plateaus at 1400 m a.s.l. in the Sibillini mountain park. The new Constructed Wetland will treat the wastewater of Castelluccio village and tourism facilities, that progressively shift from less than 50 persons during winter up to 1000 or more persons during summer. The current treatment plant is inadequate to support this great variation. The new multistage CW system is constituted by a French scheme system of 1800 m2 followed by two parallel free water-pond system as polishing stage and recreational amenity (the pond will hold several rare aquatic plants typical of the Castelluccio plateau).
One stage of reed beds fed with raw sewage assures primary and secondary treatment for 1200 People Equivalent, followed by a trickling filter for polishing and nitrification. A tertiary UV treatment enables a pathogens removal by 4 U log.