Location: Skövde, Sweden
Established: 2003
Number of basins: 10
Sludge type: Activated sludge and digested sludge
Sludge volume: 1,200 Tonnes DS/year
PE, amount: 50,000
Client: Simrishamn Municipality
Location:Simrishamn, Sweden
Established: 1998
Number of basins: 8
Sludge type: Activated sludge
Sludge volume per year: 450
PE, amount: 25,000
2-stage Vertical Flow Constructed Wetland for the treatment of raw domestic sewage (French system) for 1360 people-equivalent adapted to the local resources and climate with UV tertiary treatment.
Crynant: Two 1,200m2 vertical flow reed beds operated alternately to treat 3,400 m3/d of tertiary municipal waste water.
Saint Sulpice la Foret : a 1000 PE waste stabilization pond boosted to 1950 PE by addition of reed bed filters. A 2,400 m², vertical flow reed bed (French system), a 1,950 m² second stage vertical flow, unsaturated plus a 10,000 m² of willow plantation and a 5,000 m² pond treating 400 m3/d of domestic effluent.
Client: Sorø Municipality
Location: Tuelsø, Denmark
Established: 2003
Number of basins: 10
Sludge type: Activated sludge
Sludge volume: 550 tonnes DS/year
PE, amount: 22,000
Teeside: A 1000 m2, 3 stage passive vertical flow reed bed system, treating run off from an international airport fire fighting training facility.
Client: Galten Municipality
Location: Skovby, Denmark
Established: 1995
Number of basins: 8
Sludge type:Activated sludge
Sludge volume: 185 tonnes DS/year
PE, amount: 12,000