The Badboot in Antwerp. Treatment of sanitary wastewater combined with wastewater from the swimming pool filters. FBA-type (aerated).

Aerated wetland for a hotel in Antwerp, Belgium

Teeside: A 1000 m2, 3 stage passive vertical flow reed bed system, treating run off from an international airport fire fighting training facility.

Client: Northumbrian Water
Location: Hanningfield, UK
Established: 2012
Project period: 2010-2012
Number of basins: 16
Sludge type: Water works sludge
Sludge production: 1,275 tonnes DS/year
PE, amount: 1.5 - 2.0 million
Construction costs: approxiamtely 6 million £

Aerated wetland 1,650 m² for treatment of fruit peeling company.

A ten years old system treating the wastewater produced by a winery in Central Italy. Cecchi is a famous wine producer in Italy and the production is certified ISO14001; all the wastewater produced by the "bottling department", located in Castellina in Chianti, Province of Siena, is appropriately treated before to be discharged in a nearby stream by a multistage constructed wetland.

Client: Kolding Municipality

Location:Kolding, Denmark

Established: 1998

Number of basins: 13

Sludge type:Activated sludge and digested sludge

Sludge volume: 2,000 tonnes DS/year

PE, amount: 125,000

 

Hollange : a 432 m², vertical flow reed bed (French system) plus a 288 m² second stage unsaturated vertical flow filter, and a 1200 m² vegetated polishing zone treating 102 m3/d of domestic effluent.